On June 1st, Frank Garcia, Frank Reyes, and Craig Fulfer from the Operations and Maintenance Department coordinated a training demonstration with the Engineering Department. The training occurred at Plant 224, 236, and 238 and covered important electrical panel components and safety practices for inspecting and working on panels. The training […]
Read More...Archives for June 2023
Bartolo Transmission Main (BTM) Repair
On June 12, 2023, a leak occurred on Suburban’s Bartolo Transmission Main (BTM), one of Suburban’s most critical pipelines. The BTM is seven (7) miles long and delivers water from the Plant 201 well field in Pico Rivera to Plant 224 in Whittier. Over 120,000 customers rely on water from […]
Read More...Plant 409 Arsenic Treatment Project
The Plant 409 W-3 well in La Mirada can supply up to 1,200 gallons per minute (gpm) and is a critical local water source for the Suburban Water Systems (SWS) La Mirada service area that is less costly and uses less energy than imported water from Northern California or the […]
Read More...Texas Water Utilities helps grant Austin teen’s wish for in-home recording studio
On May 10, 2023, Texas Water Utilities and Make-A-Wish Central & South Texas surprised a local teen with an in-home recording studio on her 18th birthday. Aly’s parents built her a studio space in their backyard and Texas Water Utilities completed it with recording equipment. Our volunteers helped assemble her […]
Read More...